ToRs have been worked out on the basis of PO-PC's Drivers of Growth study, undertaken by ESRF, and finalized in view of Kilimo Kwanza. International and national consultants identified. Study started and is on-going. Stage I: Interim report expected by Jan 15. Final Report expected by 20 March 2010.Mkukuta Secretariat has confirmed this change with TACAIDS. This study is combined with the 2B1. Study has been commissioned and is on-going. An inception report was shared with the quality assurance group late December and comments were provided. Modified version of the inception report is pending. Final report expected by 30th Jan., 2010.

Attachments
Attachment Size
Status of MKUKUTA analytical studies (179.36 KB) 179.36 KB